people.com.cn Lanzhou 13 April, Lanzhou City Hall informed that, through the excavation of the pit exploration method, basic found to cause water benzene exceed the standard orientation. From April 11th start at 3 pm, staff device Cheap Miami Hurricanes Jerseys in the original Lanhua company 2500000 tons / year refinery (now west across the region of aromatics plant tank), namely the Water Service Company - 12 on both sides of the ditch excavation pit, found a large amount of oily wastewater from the pit (cumulative pumping oily sewage is about 800 tons). In April 12th, expanding excavation, excavation of 14 pits (including rubber factory 3, rubber factory north Cheap Texas A&M Football Jerseys wall from the south to the north, 10, Xisha the Yellow River bridge 1), to the pit of oily sewage sampling. According to environmental experts to the scene to analyze and judge, surrounding underground sewage is the direct cause of benzene exceed Cheap Tennessee Volunteers Jerseys the standard of water flowing groove.
Lanzhou City Hall said, the next step will be from three aspects to carry out investigation work. One is the need of the excavation pit in the extraction of oily wastewater were performed in laboratory, further from the relevance technical level verification of oily wastewater and self in the underground water benzene exceed the standard. The two is the specific leakage of No. 4, No. 3 - bit field investigation to verify the ditch. Three is to carry Cheap Penn State Nittany Lions Jerseys out further investigation to cause local water benzene exceed the standard event related to the responsibility of units and responsible person.
(original title: Cheap Kids NCAA Jerseys Lanzhou water benzene exceed the standard: excavation pit relevant persons responsible for the investigation and evidence collection)
相关的主题文章:
没有评论:
发表评论