2014年9月21日星期日

D379 times

in new network Ningbo on 23 August, (trainee reporter Lin Bo) in August 23rd, due to equipment failure, as of 10 am, the NingBo Railway Station train delayed to varying degrees, the official said the equipment fault repairing. Informed of the latest news, from the Shanghai Railway Bureau, Ningbo railway station at eleven two, equipment fault has been ruled out, the train started running again.

August 23rd, about ten fifty in the morning, the netizen "@ Jie - fat" news: Ningbo to Changzhou g7586 in Ningbo station 100 meters because of network no power lead to malfunction, High-speed Rail power off air conditioning, "inside a stuffy hours, are the children off the car."

Cheap Steelers Jerseys at the same time, Shanghai Railway Bureau, Ningbo railway official micro-blog "iron of Ningbo Train Operation Depot" news release said: "due to equipment failure, as of August 23rd 10 Xu, effect of G7586 times, D379 times, D5482 times, G7670 times, G7568 times, G7503 times some trains delayed Cheap Buccaneers Jerseys to varying degrees. The railway departments are actively repair, this inconvenience to you, we Cheap Panthers Jerseys apologize."

informed of the latest news, from the Shanghai Railway Bureau, Ningbo railway station at eleven two, equipment fault has been ruled out, the train started running again.

Delays caused by the

for the Ningbo Train Operation Depot, iron said, according to the Cheap Ravens Jerseys usual delays treatment, not the passengers on the bus can be refund, change processing.

Cheap Vikings Jerseys (end)

(original title: NingBo Railway Station train delays exceed 1 hours officials said the equipment failure has been repaired)

没有评论:

发表评论